Los Angeles

Los Angeles International Airport. Photo by Stefany Hedman.

Work 70 Percent Complete on Automated People Mover at LAX

Work is over 70 percent complete on the Automated People Mover (APM) guideway at Los Angeles International Airport. Currently, the connection from the guideway over Century Boulevard is underway. The only additional sections to be connected are over Sepulveda Boulevard and between the Center and West Central Terminal Area.

Read More

5935 West Pico Boulevard

Rebar Cage Construction Seen At 5935 West Pico Boulevard, Carthay, Los Angeles

After a year of groundbreaking, construction is picking up its pace at 5935 West Pico Boulevard in Carthay, Los Angeles. The project proposal includes the development of a mixed-use project with residential and retail space. Plans call for the demolition of an existing vacant strip mall. Cityview is the project developer. Togawa Smith Martin is responsible for the design concepts and construction.

Read More


655 Mesquit Street

Office Tower Proposed At 655 Mesquit Street In Arts District, Los Angeles

Construction plans for the proposed office tower have started to move forward at 655 Mesquit Street in Arts District, Los Angeles. The project proposal includes the development of a fourteen-story office building with ground-floor retail space. The new construction will replace a parking lot on the site. Continuum Partners and Platinum Equity are the project developers. EYRC Architects is responsible for the design concepts and construction.

Read More

Jordan Downs Area H Building

189 Apartments Take Shape At 9800 Grape Street In Watts, Los Angeles

Plans for the redevelopment of the Jordan Downs apartment complex at 9800 Grape Street in Watts, Los Angeles, are in full swing. A total of 189 apartments are fully framed, with exterior finishes starting to take shape at the property site. BRIDGE Housing Corp is the project developer. AC Martin is responsible for the design concepts and construction.

Read More

Fetching more...